CPC HOME
CPC CORPORATE
CPC PRODUCTS
CPC CIRCUIT BREAKERS
CPC SWITCHGEAR
CPC CUSTOM FAB
CPC ENGINEERING
CPC SALES
CPC CONTACT

Controlled Power LLC
Office: 219 East Maple St, Suite 100/200E
North Canton, OH USA 44720
Phone: 330.834.3200
Fax: 330.834.3201
Corp HQ:
2950 E. Philadelphia Street
Ontario, CA 91761
Phone: 909-923-1800
Toll-Free: 866-MY-MYERS
Fax: 909-923-1806

sales@controlledpower.com

 

New York City, NY -
Port Authority (PATH)-

World Trade Center Site-

When the Twin Towers fell on September 11, 2001, the 1 9 Line tunnel and the subway infrastructure beneath them were heavily damaged.

The tunnel was filled with rubble, utilities collapsed, and there was serious flooding from broken water mains. The Port Authority (PATH) and the City's Department of Transportation set forth to rebuild this system on the Fast Track.



CASE STUDIES OF PRIOR PERFORMANCE:

BART | PSEG | NIAGRA MOHAWK

NEW YORK CITY, PORT AUTHORITY


CP is proud to be the supplier of DC Switchgear and Rectifiers for this project. Our HSN DC Circuit Breaker was chosen as the sole source for this project.

CP completed shipment of the DC Switchgear ahead of schedule allowing PATH to restore partial service to Exchange Place Station by June 29th, 2003, and trains linking the station to the World Trade Center by the end of 2003.


Copyright © 2000-2005 Controlled Power, LLC. All Rights Reserved.